Public Works
August 2018
Asphalt paving for Grant Elementary School
Reinstall AC Paving, Repair access road, re stripe, install and paint all play yard games.
Petaluma City Schools
Owner Contact - Dave Ashe 707-327-8788
Construction Cost - $109,000 – 30 days
May 2018
Organic Farm Parking Lot Improvements: Demo existing lot, lighting, concrete and asphalt, remove and replace below grade utilities, gas, water, storm drain, electrical, sewer. Reinstall ac, curb gutter and sidewalk, ADA pathway, stairs, rails, bio swale, new lighting, bollards, new landscaping, AC and striping.
Marin Community College District
Owner Contact - Billy Pate 408-218-8830
Construction Cost - $1,525,000 - 8 months
April 2009
Construct Data Center for Golden Gate Transportation District: Site work, underground electrical, water, and fire suppression system, grade and prep building pad including importing and compaction, perimeter and grade beam concrete foundation, construct metal framed, 3000 sf building, insulation, sheetrock, stucco exterior, substantial HVAC, electrical and data systems.
For: Golden Gate Bridge Transit Department
Owner Contact: Jorge Lee – (415) 923-2030
Construction Cost: $1,352,000 – 160 Days
August 2008
Security Upgrades for Bus Transit Facility: Underground utilities, fencing, automatic gates and card access system, security cameras, concrete ramps, asphalt.
For: Golden Gate Bridge Transit Department
Owner Contact: Jorge Lee – (415) 923-2030
Construction Cost: $590,000 – 120 Days
July 2008
Site work including underground electrical, fire suppression system, water and gas connection to city services, foundation, asphalt, handicap access ramps, and installation of modular building.
For: Calistoga Unified School District
Owner Contact: Alexis Persinger – Persinger Architects (707) 887-0700
Construction Cost: $140,000 – 60 Days
October 2007
Site work including underground electrical, fire suppression system, water and gas connection to City Services, foundation, asphalt, handicap access ramps, and installation of modular building.
For: City of Sonoma Overnight Shelter
Owner Contact: Wayne Wirick (707) 938-3681
Construction Cost: $365,000 – 60 Days
September 2007
Site work including mound septic system, underground electrical, water, and fire suppression system, grade and prep building pad including importing and compaction, perimeter and grade beam concrete foundation, install parking area, asphalt, handicap access ramp, and install 3000sf Modular Building.
For: City of Sonoma Corporation Yard
Owner Contact: Wayne Wirick (707) 938-3681
Construction Cost: $640,000 – 180 Days
July 2007
Grade and prep building pad including 5.5 ft over-excavation, import and compaction of engineered fill, concrete foundation, underground electrical, water and sewer including fire suppression system for relocatable building.
For: Freemont Elementary School
Owner Contact: Neil Bohn - Counterpoint Construction Services (707) 545-8440
Construction Cost: $81,000 – 30 days
July 2007
Handicapped accessibility upgrades, including new 12 stall bath facilities, demo and reinstall concrete pad, various interior tenant improvements, including new fire alarm system.
For: Willowside Middle School
Owner Contact: Neil Bohn - Counterpoint Construction Services (707) 545-8440
Construction Cost: $359,000 - 90 days
June 2007
Interior Tenant Improvements for Nursing Lab Demo and renovate 2500 sf space to create new classrooms, framing, insulation, flooring, doors, windows, sheetrock, painting, electrical and plumbing fixtures for use as a nurse stations.
For: Sonoma State University
Contact: Project Manager Nora Hild – (707) 664-2317
Construction Cost: $259,000 – 45 days
May 2007
Stick Frame and Build small kitchen concession stand, including foundation, masonry exterior details and brick wainscoting, interior finishes, roofing, connection to existing sewer and water systems, underground electrical, and complete interior systems for commercial kitchen.
For: Santa Rosa Junior College
Owner Contact: Paul Bielen – (707) 524-1606
Construction Cost: $98,000 – 30 days
August 2006
Prep building pad, including import and compaction of engineered fill and site work for two relocatable buildings, foundation, underground electrical, connect to existing sewer and water systems.
For: Windsor School District
Owner Contact: Neil Bohn -Counterpoint Construction Services (707) 545-8440
Construction Cost: $127,390 – 30 days
June 2006
Interior renovations for 4500 sf classroom area, demo and reinstall all framing, sheetrock, doors, concrete flooring, insulation, complex plumbing in and under slab for Chemistry Lab; including underground acid tank and wash stations.
For: Roseland University Prep School
Owner Contact: Ken Coker, Coker Architects (707) 527-0880
Construction Cost: $598,000 – 90 day
May 2006
Renovate empty space to office use, metal framing, fire suppression system, sheetrock, insulation, paint, doors & windows, new kitchen, flooring and ADA bathrooms.
For: Tenant Improvements City of Healdsburg
Owner Contact: Scott Ward (707) 431-3348
Interior upgrades of unfinished office space
Construction Cost: $149,000 – 30 days
May 2006
Demolition removal and recycle of 381,000 gal reinforced concrete septic grinder, underground water supply and storm drain system, complex underground electrical system to various buildings at various depths, Fire suppression system.
For: City of Cloverdale Corporate Yard
Owner Contact: Ross Egge – (707) 894-1725
Construction Cost: $288,000 – 90 days
June 2005
Interior ADA and Fire Safety Upgrades interior fire doors, exterior automatic doors, new stairway area and concrete stairs, flooring, paint, sheetrock.
For: Stevenson Hall Sonoma State University
Owner Contact: Nora Hild (707) 664-2317
Construction Cost: $207,000 – 60 days
May 2005
Site work for Re locatable Buildings, excavation, off haul unsuitable soil, import and compact engineered fill to grade and prep new pad for relocatable building, underground electrical, storm drain; connect to existing sewer.
For: Steele Lane Elementary
Owner Contact: Jim Bohn Counterpoint Construction (707) 545-8400
Demo and Site work for new re locatable building
Construction Cost: $89,000 – 30 days
May 2005
Site work for relocatable Buildings.
For: Proctor Terrace Elementary
Owner Contact: Jim Bohn Counterpoint Construction (707) 545-8400
Demo and Site work for new relocatable building
Construction Cost: $120,000 – 30 days
August 2004
Demo and off haul existing security building, prepare site with underground utilities including modifications to storm sewer system, electrical, fire suppression, water and sewer. Install 2000 sf modular building and 1200 sf metal reinforced awning with 4ft x 10 x 6 ft footings.
For: Sonoma County Airport Security Screening Building
Owner Contact: Paul Bellomo (707) 688-2620
Construction Cost: $345,000
July 2004
ADA Upgrades Stevenson Hall.
For: Sonoma State University
Owner Contact: Chris Dinno (707) 664-2317
Exterior Upgrades
Construction Cost: $120,000 – 45 days
June 2004
ADA upgrades Traminer and Barbera Hall
For: Sonoma State University
Owner Contact: Norm Dickenson (707) 707-664- 2317
Exterior & Interior Upgrades to Student Housing
Construction Cost: $251,000 – 60 days
April 2004
New Anthropology Building and fire protection system, site preparation, grading, pad preparation including import and compaction of engineered fill for building pad, trench and install underground utilities, including electrical, fire suppression, water and gas. Stick frame and build 2000sf building including all interior finishes and systems.
For: Sonoma State University
Owner Contact: Norm Dickenson – (707) 707- 664-2317
New 2000 SF building
Construction Cost: $246,000
January 2004
Remodel existing warehouse into fully finished office space, including new ADA bathrooms, gas heating system, metal framing for interior office space, insulation, sheetrock, electrical work, doors, windows, paint. New underground fire suppressions system connected to the City water service Petaluma Blvd N in Petaluma, including all traffic control required by DOT.
City of Petaluma Transit Building Remodel
Owner Contact - Steve Castaldo (707) 778-4421
Construction Cost $ 291,910 – 45 days
November 2003
ADA Pathway at Veterans Building, demo existing 15000 ft asphalt parking lot, re grade with engineered fill to allow installation of new 5000 sf walkway between the cemetery and the facility, fine grading to assure ADA compliance throughout walkway.
For: Sonoma Veterans Building
Owner Contact: Sonoma County Architects office Barry Leduq (707) 565-1221
Construction Cost: $46,196 – 30 days
August 2003
Install Football Field and Track Path, grading and landscaping to create new football and track field, including import and grading of 1000 yards of engineered fill material, all grading to perfectly level field, fine grading and installation of landscaping and complex irrigation system.
For: Twin Hills Union School District
Owner Contact: Marlin Jones - RGM Associates, (707)824-7943
Construction Cost: $189,200 – 30 days